 === From World Housing Encyclopedia === === From World Housing Encyclopedia ===
  
-{{ :reports:report_1:rp1_general_info_1.jpg?nolink&400*400 |}} +{{ :reports:report_1:rp1_general_info_1.jpg?nolink&200*200 | }}
 ---- ----
  
Line 9: Line 8:
  
 **Report:** 1 **Report:** 1
- 
-**Report Date:**  
  
 **Country:** Argentina **Country:** Argentina
Line 39: Line 36:
  
 ==== 2. Features ==== ==== 2. Features ====
 +
 +{{gallery>:reports:report_1?rp1_general_info_*.jpg&200x200&lightbox&crop&4 | }}
  
 **Plan Shape:** Rectangular, solid **Plan Shape:** Rectangular, solid
Line 81: Line 80:
  
 **Additional comments section 2:** When separated from adjacent buildings, the typical distance from a neighboring building is 5 meters. **Additional comments section 2:** When separated from adjacent buildings, the typical distance from a neighboring building is 5 meters.
- 
-{{gallery> :reports:report_1?rp1_features_*.jpg&160x160&lightbox&crop | }} 
  
 ---- ----
Line 106: Line 103:
  
 **Expertise of those involved in the design process:** The professionals involved in the design and construction process -architects and engineers- have a good level of expertise and great experience in this type of construction, typical in San Juan. **Expertise of those involved in the design process:** The professionals involved in the design and construction process -architects and engineers- have a good level of expertise and great experience in this type of construction, typical in San Juan.
 +
 ---- ----
  
Line 114: Line 112:
 **Roles of those involved in the building process:** The builder usually does not live in this construction type. It is designed and built by professionals and used in housing plans developed and financed by the state. **Roles of those involved in the building process:** The builder usually does not live in this construction type. It is designed and built by professionals and used in housing plans developed and financed by the state.
  
-**Construction process and phasing.** The construction process is usually carried out by a construction company. It begins with the filling in of foundations, the assembling of the bottom reinforced+**Construction process and phasing:** The construction process is usually carried out by a construction company. It begins with the filling in of foundations, the assembling of the bottom reinforced
 concrete beams and columns and the casting of these beams. Then the block masonry walls are being built and the concrete columns are being cast. Subsequently, the top reinforced concrete beams are assembled and the slab concrete is poured. The tools and equipment typically used are. spatulas, shovels, hoes, baskets, saws, pliers, levels, cement mixers, etc. This type of construction is generally concrete beams and columns and the casting of these beams. Then the block masonry walls are being built and the concrete columns are being cast. Subsequently, the top reinforced concrete beams are assembled and the slab concrete is poured. The tools and equipment typically used are. spatulas, shovels, hoes, baskets, saws, pliers, levels, cement mixers, etc. This type of construction is generally
 designed for its final constructed size, but usually the final designed for its final constructed size, but usually the final
 size is fulfilled in a later stage, as an extension of the original construction. Sometimes the owner also builds additional parts, generally without any professional input. size is fulfilled in a later stage, as an extension of the original construction. Sometimes the owner also builds additional parts, generally without any professional input.
 +
 ---- ----
  
Line 128: Line 127:
  
 **Process for building code enforcement:** The provincial authorities approve the design and controls the construction process. To start the process of construction it is necessary to have the approval of the general and structure plans, the electrical wiring plans, plumbing, and gas plans. This approval is provided by the Provincial Authorities. A construction license provided by the Municipal Authorities is also required. **Process for building code enforcement:** The provincial authorities approve the design and controls the construction process. To start the process of construction it is necessary to have the approval of the general and structure plans, the electrical wiring plans, plumbing, and gas plans. This approval is provided by the Provincial Authorities. A construction license provided by the Municipal Authorities is also required.
 +
 ---- ----
  
Line 180: Line 180:
 ==== 5. Earthquakes ==== ==== 5. Earthquakes ====
  
-{{ :reports:report_1:rp1_earthquakes_1.jpg?nolink&474*710 |}}+{{gallery>:reports:report_1?rp1_earthquakes_*.jpg&200x200&lightbox&crop&| }}
  
 **Past Earthquakes in the country which affected buildings of this type:** **Past Earthquakes in the country which affected buildings of this type:**
Line 195: Line 195:
  
 **Additional comments on earthquake damage patterns:** During the earthquake of 1977 in Caucete, in the capital city of San Juan, located about 100 km from the epicenter, the intensity was between VII and VIII. The buildings of this construction type sustained no serious damage. **Additional comments on earthquake damage patterns:** During the earthquake of 1977 in Caucete, in the capital city of San Juan, located about 100 km from the epicenter, the intensity was between VII and VIII. The buildings of this construction type sustained no serious damage.
 +
 ---- ----
  
Line 202: Line 203:
  
 The total width of door and window openings in a wall is: For brick masonry construction in cement mortar : less than ½ of the distance between the adjacent cross walls; For adobe masonry, stone masonry and brick masonry in mud mortar: less than 1/3 of the distance between the e adjacent cross walls; For precast concrete wall structures: less than 3/4 of the length of a perimeter wall. The total width of door and window openings in a wall is: For brick masonry construction in cement mortar : less than ½ of the distance between the adjacent cross walls; For adobe masonry, stone masonry and brick masonry in mud mortar: less than 1/3 of the distance between the e adjacent cross walls; For precast concrete wall structures: less than 3/4 of the length of a perimeter wall.
 +
 ---- ----
  
Line 235: Line 237:
  
 **Seismic deficiency in roof and floors:** No seismic deficiencies. **Seismic deficiency in roof and floors:** No seismic deficiencies.
 +
 ---- ----
  
Line 248: Line 251:
  
 ==== 6. Retrofit Information ==== ==== 6. Retrofit Information ====
 +
 +
 +{{gallery>:reports:report_1?rp1_retrofit_*.jpg&200x200&lightbox&crop&4 | }}
  
 === Description of Seismic Strengthening Provisions === === Description of Seismic Strengthening Provisions ===
Line 255: Line 261:
  
 ---- ----
- 
-{{ :reports:report_1:rp1_retrofit_info_1.jpg?nolink&400 |}} 
  