reports:report_1
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
reports:report_1 [2021/02/25 22:17] – external edit 127.0.0.1 | reports:report_1 [2025/04/29 15:16] (current) – external edit 127.0.0.1 | ||
---|---|---|---|
Line 2: | Line 2: | ||
=== From World Housing Encyclopedia === | === From World Housing Encyclopedia === | ||
- | {{ : | + | {{ : |
---- | ---- | ||
Line 9: | Line 8: | ||
**Report:** 1 | **Report:** 1 | ||
- | |||
- | **Report Date: | ||
**Country: | **Country: | ||
Line 39: | Line 36: | ||
==== 2. Features ==== | ==== 2. Features ==== | ||
+ | |||
+ | {{gallery>: | ||
**Plan Shape:** Rectangular, | **Plan Shape:** Rectangular, | ||
Line 81: | Line 80: | ||
**Additional comments section 2:** When separated from adjacent buildings, the typical distance from a neighboring building is 5 meters. | **Additional comments section 2:** When separated from adjacent buildings, the typical distance from a neighboring building is 5 meters. | ||
- | |||
- | {{gallery> | ||
---- | ---- | ||
Line 106: | Line 103: | ||
**Expertise of those involved in the design process:** The professionals involved in the design and construction process -architects and engineers- have a good level of expertise and great experience in this type of construction, | **Expertise of those involved in the design process:** The professionals involved in the design and construction process -architects and engineers- have a good level of expertise and great experience in this type of construction, | ||
+ | |||
---- | ---- | ||
Line 114: | Line 112: | ||
**Roles of those involved in the building process:** The builder usually does not live in this construction type. It is designed and built by professionals and used in housing plans developed and financed by the state. | **Roles of those involved in the building process:** The builder usually does not live in this construction type. It is designed and built by professionals and used in housing plans developed and financed by the state. | ||
- | **Construction process and phasing.** The construction process is usually carried out by a construction company. It begins with the filling in of foundations, | + | **Construction process and phasing:** The construction process is usually carried out by a construction company. It begins with the filling in of foundations, |
concrete beams and columns and the casting of these beams. Then the block masonry walls are being built and the concrete columns are being cast. Subsequently, | concrete beams and columns and the casting of these beams. Then the block masonry walls are being built and the concrete columns are being cast. Subsequently, | ||
designed for its final constructed size, but usually the final | designed for its final constructed size, but usually the final | ||
size is fulfilled in a later stage, as an extension of the original construction. Sometimes the owner also builds additional parts, generally without any professional input. | size is fulfilled in a later stage, as an extension of the original construction. Sometimes the owner also builds additional parts, generally without any professional input. | ||
+ | |||
---- | ---- | ||
Line 128: | Line 127: | ||
**Process for building code enforcement: | **Process for building code enforcement: | ||
+ | |||
---- | ---- | ||
Line 180: | Line 180: | ||
==== 5. Earthquakes ==== | ==== 5. Earthquakes ==== | ||
- | {{ : | + | {{gallery>: |
**Past Earthquakes in the country which affected buildings of this type:** | **Past Earthquakes in the country which affected buildings of this type:** | ||
Line 195: | Line 195: | ||
**Additional comments on earthquake damage patterns:** During the earthquake of 1977 in Caucete, in the capital city of San Juan, located about 100 km from the epicenter, the intensity was between VII and VIII. The buildings of this construction type sustained no serious damage. | **Additional comments on earthquake damage patterns:** During the earthquake of 1977 in Caucete, in the capital city of San Juan, located about 100 km from the epicenter, the intensity was between VII and VIII. The buildings of this construction type sustained no serious damage. | ||
+ | |||
---- | ---- | ||
Line 202: | Line 203: | ||
The total width of door and window openings in a wall is: For brick masonry construction in cement mortar : less than ½ of the distance between the adjacent cross walls; For adobe masonry, stone masonry and brick masonry in mud mortar: less than 1/3 of the distance between the e adjacent cross walls; For precast concrete wall structures: less than 3/4 of the length of a perimeter wall. | The total width of door and window openings in a wall is: For brick masonry construction in cement mortar : less than ½ of the distance between the adjacent cross walls; For adobe masonry, stone masonry and brick masonry in mud mortar: less than 1/3 of the distance between the e adjacent cross walls; For precast concrete wall structures: less than 3/4 of the length of a perimeter wall. | ||
+ | |||
---- | ---- | ||
Line 235: | Line 237: | ||
**Seismic deficiency in roof and floors:** No seismic deficiencies. | **Seismic deficiency in roof and floors:** No seismic deficiencies. | ||
+ | |||
---- | ---- | ||
Line 248: | Line 251: | ||
==== 6. Retrofit Information ==== | ==== 6. Retrofit Information ==== | ||
+ | |||
+ | |||
+ | {{gallery>: | ||
=== Description of Seismic Strengthening Provisions === | === Description of Seismic Strengthening Provisions === | ||
Line 255: | Line 261: | ||
---- | ---- | ||
- | |||
- | {{ : | ||
==== 7. References ==== | ==== 7. References ==== |
reports/report_1.1614291429.txt.gz · Last modified: 2025/04/29 15:16 (external edit)