WHE-kipedia

User Tools

Site Tools


reports:report_6

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
reports:report_6 [2021/03/01 11:23] – [6. Retrofit Information] luisareports:report_6 [2025/04/29 15:16] (current) – external edit 127.0.0.1
Line 90: Line 90:
 ---- ----
  
-==== 3. Buildings Process ====+==== 3. Building Process ====
  
 === Description of Building Materials=== === Description of Building Materials===
Line 291: Line 291:
 **Additional comments on seismic strengthening provisions:**  **Additional comments on seismic strengthening provisions:** 
  
-**Has seismic strengthening described in the above table been performed?:** The hospital at San Antonio was repaired; however, the details are not available.+**Has seismic strengthening described in the above table been performed?** The hospital at San Antonio was repaired; however, the details are not available.
  
-**Was the work done as a mitigation effort on an undamaged building or as a repair following earthquake damages?:** This is not a common activity in Chile. The only situation when buildings are repaired is after an earthquake, when some constructive deficiencies appeared. It is normal to observe some small cracks in the concrete.+**Was the work done as a mitigation effort on an undamaged building or as a repair following earthquake damages?** This is not a common activity in Chile. The only situation when buildings are repaired is after an earthquake, when some constructive deficiencies appeared. It is normal to observe some small cracks in the concrete.
  
 **Was the construction inspected in the same manner as new construction?**  **Was the construction inspected in the same manner as new construction?** 
  
-**Who performed the construction: a contractor or owner/user? Was an architect or engineer involved?:** A contractor performed the construction, of course an architect and engineer were involved.+**Who performed the construction: a contractor or owner/user? Was an architect or engineer involved?** A contractor performed the construction, of course an architect and engineer were involved.
  
-**What has been the performance of retrofitted buildings of this type in subsequent earthquakes?:** Since 2001, no subsequent earthquake has occurred in the central zone of Chile.+**What has been the performance of retrofitted buildings of this type in subsequent earthquakes?** Since 2001, no subsequent earthquake has occurred in the central zone of Chile.
  
 **Additional comments section 6:**  **Additional comments section 6:** 
reports/report_6.1614597796.txt.gz · Last modified: 2025/04/29 15:16 (external edit)

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki